Premium Middle Board High Quality Switch Mould for Electronics

Product Details
Customization: Available
Shaping Mode: Plastic Molding Die
Surface Finish Process: Polishing
Still deciding? Get samples of US$ 100/Piece
Request Sample
Manufacturer/Factory & Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (18)
  • Premium Middle Board High Quality Switch Mould for Electronics
  • Premium Middle Board High Quality Switch Mould for Electronics
  • Premium Middle Board High Quality Switch Mould for Electronics
  • Premium Middle Board High Quality Switch Mould for Electronics
  • Premium Middle Board High Quality Switch Mould for Electronics
  • Premium Middle Board High Quality Switch Mould for Electronics
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
DM90-3
Mould Cavity
Multi Cavity
Plastic Material
PC
Process Combination Type
Single-Process Mode
Application
Car, Household Appliances, Hardware
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
TS16949
Standard
HASCO
Customized
Customized
Forming Method
Injection Moulding
Surface Treatment Process
Polishing
Place of Production
Wenzhou
Process Combination
Precision-CNC Machined
Origin
Wenzhou

Product Description

Product Description

 


Experience unparalleled precision with our Custom Plastic Molds for Small Switch Socket Components. Each mold is meticulously crafted to ensure flawless performance and reliability, meeting the highest industry standards. Trust Wenzhou Desheng Mold Technology Co., Ltd to deliver exceptional quality and precision in every mold.

Product Description
                                              Plastic Injection Mold for Internal External Thread Cover Cap Lid
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.
Detailed Photos

 


Premium Middle Board High Quality Switch Mould for ElectronicsPremium Middle Board High Quality Switch Mould for Electronics
Premium Middle Board High Quality Switch Mould for ElectronicsPremium Middle Board High Quality Switch Mould for ElectronicsPremium Middle Board High Quality Switch Mould for ElectronicsPremium Middle Board High Quality Switch Mould for Electronics
FAQ
 

 

Q1: Could i put my own logo on it?
A: Sure, We accept OEM and ODM.

Q2: What is your sample policy?
A: We can supply the sample, and no need to pay the shipping cost.

Q3: Could i produce according to the samples?
A: Of course, we can produce by your samples or technical drawing, We can build the molds.

Q4: How long is production time?
A: Based on the quantities, sample order 7-15days, mass order 30-60days.

Q5: What is the standard package?
A: 1PC in poly bag, 10pcs in a middle box, 100boxes in a outer carton.

Q6: Do you test all your goods before delivery?
A: Prepay 30% deposit, Rest account by T/T against B/L copy. 


Premium Middle Board High Quality Switch Mould for Electronics
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier